Work | Area | Unit | Rate/Unit | Cost | ||
---|---|---|---|---|---|---|
Enter the Total Construction Area including Headroom | sqft | Rs.1950 | Rs. 0 | |||
Size of RCC Water Sump | ltr | Rs.12 | Rs. 0 | |||
Size of Septic Tank | ltr | Rs.12 | Rs. 0 | |||
Total Construction Cost | Rs. 0 |
Note : * 1 cft = 28.317 ltr